Planner feature
Jira Sprint Capacity Planning on the Timeline
Plan Jira sprint capacity on one timeline: every sprint across its real dates, each person's sprint issues on their own timeline, and their available capacity right beside it. You spot the overloaded developer before the sprint starts, not at the retro.
30-day free trial on the Atlassian Marketplace.
1
Plan the sprint in Jira
Sprint 24 on the Customer Portal board: five issues, Nov 16 to 27.
2
Show it on the Planner
Open the Milestones Panel. The sprint appears across its dates.
3
See what's in it
Expand the sprint to list its issues and their statuses.
4
Timelines fill in
Issues span the sprint on each row. Tom's workload turns red: 96h of 80h.
5
Rebalance first
Move PORT-415 to Emma, who had capacity. Everyone is green before day one.
6
Look sprints ahead
Widen the period to six weeks: Sprints 23, 24 and 25 side by side.
What Are Sprints on the Timeline in ActivityTimeline?
Sprints on the timeline is how ActivityTimeline's Planner shows Jira Scrum sprints. The Milestones Panel draws each sprint across its Start and End dates above the team's timelines, and assigned sprint issues appear on each person's row for the sprint period, with no manual scheduling. The workload indicator then shows who has available capacity and who is overloaded.
ActivityTimeline is a resource planning, capacity management and time tracking app for Jira. Its Planner is where sprints, people and capacity meet.
Sprint dates or issue dates?
If an issue has its own mapped Start and End dates, those win and the issue sits only on those days. Leave them empty, or unmapped, and the issue spans the sprint. Try both in the demo.
Empty in Jira, or not mapped
The issue spans the whole sprint, from Start to End date.
Mapped and filled in
The issue sits on its own dates. These take priority over sprint dates.
Admin set to prefer sprint dates
The issue moves to the sprint dates after a Refresh.
What You Can Do with Sprints on the Timeline
See the sprint, fill each timeline from its dates, and fix overloads before the team commits.
See every sprint across its dates
The Milestones Panel shows sprints from the Scrum boards you choose. Expand one to list its issues and their current statuses, or drag an issue onto the sprint line to set its Sprint field in Jira. Changes in Jira sync every 10 minutes, or at once with Refresh.
Fill timelines from sprint dates
Once an issue is in a sprint with dates and has an assignee, it appears on that person's timeline for the whole sprint, next to their time off and other work.
Check capacity before you commit
Workload indicators under each name turn light green with spare capacity, green when balanced and red when someone is overloaded. Reassign, move or split an issue until the sprint fits.
How to Plan Sprint Capacity in Jira with ActivityTimeline
Three steps on the Planner, before the sprint starts.
Step 1 · Show the sprint
Open the Milestones Panel with the flag icon, click the cog icon and choose your Jira project and Scrum board. Switch to Team with Users to see the team and each person together.
Step 2 · Check available capacity
Set the Planner period to the sprint and read each workload indicator. Switch to Total Team Availability to see what is left after time off and existing work.
Step 3 · Assign and rebalance
Group the Issue Panel by sprint, assign issues to people, then reassign, move or split work until nobody is red.
Sprints on the Timeline FAQ
What Scrum masters and team leads ask before planning a sprint in ActivityTimeline.
Still have a question?
Contact us through the support portalPlan Your Next Sprint Around Real Capacity
Try sprints on the timeline with your own Jira boards for 30 days, or let us walk your team through it in a 25-minute demo.
30-day free trial on the Atlassian Marketplace.
Questions first?
Contact us through the support portal