Reports feature
Planned vs Actual Chart for Jira: Scheduled vs Logged Time, Week by Week
The Planned vs Actual Chart in ActivityTimeline puts your team's capacity, scheduled time and logged time side by side for every week or month, so the weeks where the plan and the real work drifted apart stand out.
30-day free trial on the Atlassian Marketplace.
Sample Planned vs Actual Chart for a product team, 1 Sep to 26 Oct 2026: Total Available Capacity, Scheduled Time and Logged Time for each week.
How to read the Planned vs Actual Chart
Total Available Capacity
The striped grey bar, shown when you report by team. It is the most work the team can take on in the period, from the combined capacity of its members.
Scheduled Time
The blue bar in front of the grey one: the hours planned from Original Estimates, Bookings and Placeholders. Grey above the blue is capacity nobody planned. Blue above the grey means the team is overbooked.
Logged Time
The green bar beside them: the hours people actually logged. Where it is taller or shorter than the blue bar, the plan and the real work went apart.
What Is a Planned vs Actual Chart in Jira?
A planned vs actual chart compares the hours a team planned with the hours it really worked, period by period. In ActivityTimeline, planned is Scheduled Time: the Original Estimates of Jira issues plus Bookings and Placeholders. Actual is Logged Time from worklogs. Report by team and the chart adds Team Capacity, so you also see whether the plan fit the team.
ActivityTimeline is a resource planning, capacity management and time tracking app for Jira. The chart is part of its Reports module, next to the Planned vs Actual Report and the utilization charts.
Explore the Reports module →Reading one week: WEB · Website relaunch, 22 to 28 Sep
Scheduled Time 23h, Logged Time 41h. The project took almost twice the hours it was planned for. That points to estimates that were too low and to work that will now land later than planned.
Shows
Scheduled Time and Logged Time per week or month, plus Team Capacity when you report by team
Scheduled Time
Original Estimate of Jira issues, plus Bookings and Placeholders
Logged Time
Hours logged through the Log Work dialog, in Jira or in ActivityTimeline
Team Capacity
The combined capacity of the team's members, drawn as a grey Total Available Capacity bar behind Scheduled Time
Report By
Team, Project, Epic or Jira Filter
Display Units
Week or Month
Period
A preset such as Next 10 Weeks, or a Custom Period
What You Can Do with the Planned vs Actual Chart
Check the plan against capacity, see where the real work left it, and slice the view the way your teams report.
Check the plan against team capacity
Report by team and a grey Total Available Capacity bar sits behind the scheduled work. Pick a period ahead, such as the next 10 weeks, and the overbooked weeks show before they start.
See where logged time left the plan
Scheduled Time and Logged Time stand side by side for every week. A week planned at 23 hours that took over 40 points to an estimate that missed and a schedule that will slip.
Slice it by team, project, epic or Jira filter
Report on one team, one project, one epic or a Jira filter that spans several projects. Switch between Week and Month, set a Custom Period, and filter the result.
How to Create a Planned vs Actual Chart in Jira
Three steps in ActivityTimeline. The data comes from the estimates, bookings, placeholders and worklogs you already have.
Step 1 · Choose the period and the scope
Open the Planned vs Actual Chart in ActivityTimeline Reports. Choose a Period and how to Report By: Team, Project, Epic or Jira Filter. Then pick the team, project, epic or filter.
Step 2 · Create the chart
Click Create. ActivityTimeline draws Scheduled Time and Logged Time for each week, plus Team Capacity when you report by team.
Step 3 · Adjust it and read the gaps
Use the settings at the top right to change the team, the Display Units, the period or the filters, then click Apply. Start with the weeks where the two bars split furthest apart.
Tip: check that worklogs are complete before a review. Logged Time only means something when people log their hours.
Planned vs Actual Chart: Common Questions
Answers about reading and building the Planned vs Actual Chart in ActivityTimeline.
Still have a question?
Contact us through the support portalSee Where Your Plan and Your Logged Hours Drifted Apart
Start a 30-day free trial and build the chart for your own team, or see it in a 25-minute live demo with a product specialist.
30-day free trial on the Atlassian Marketplace.
Questions first?
Contact us through the support portal